Fitness for Service Assessment
Electricity Authority of Cyprus (EAC)
Date: Nov 2012 - May 2013
Nortest Cyprus Ltd undertakes a challenging task to re-evaluate the condition of 15 fuel storage tanks, associated piping and structural integrity of the steel structures, ranging from 1,500 to 30,000m3, following a huge and devastating blast that destroyed almost completely the biggest Power Station in Cyprus at Vasiliko in July 2012.
Our experts acting as independent specialists, have evaluated and assessed the extent of the damage with the results being reported to the Insurance Companies for further action.
Following our evaluation our high calibre engineers consulted the client on the proper way of repairing, abiding strictly with the American Petroleum Institute codes.
Nortest was also appointed QA/QC Consultant to monitor the restoration project on behalf of the client.
Our actions have reduced downtime to the minimum and saved the client millions of dollars.